Thanks Mick
Bobcat. Although it was too boggy three quarters of the way through, and done the last quarter by hand. I might as well of done it all by hand as the machine left foot deep wheel ruts around the whole yard. Took me almost a day just to smooth out the damage, but they did remove around 30 metres. Dirt level was over path level all over, so lowered it all by about 5 inches before softfall and mulch.